MakeMyBase plugs into every PM system, every spec sheet, every RFI log, every submittal, every change order — then turns the whole project into one AI workspace your superintendents, project managers, and owners can actually use.
Every connector is two-way and incremental. We never re-pull what we already have, and every answer cites the exact drawing, spec section, or RFI it came from.
Every response points back to the exact drawing, spec section, or RFI it came from.
"What spec section covers the waterproofing membrane on the south tower?"
Section 07 14 00 — Fluid-Applied Waterproofing. Approved product is Tremco ExoAir 230. Submittal #ST-044 approved 03/12. Source: spec_book_south_tower.pdf, p.142.
"Show every open RFI on the west wing older than 10 days."
6 RFIs. 2 are overdue (structural steel embeds, MEP rough-in). Architects responded to 3. Average response time this month: 4.2 days. Source: Procore RFI log + ACC.
"What's our change-order exposure on the parking garage so far?"
$847,200 across 14 COs. $312K approved, $535K pending owner review. Biggest driver: unforeseen soil conditions (CO-09, +$410K). Source: Viewpoint Vista + Procore.
A live MakeMyBase chat, primed on the questions construction teams ask every day. No sign-up — type something below.
Hi — I'm MakeMyBase. Ask me anything a construction team might ask: spec lookups, RFI status, change-order exposure, submittal tracking, safety compliance, drawing revisions. Try a suggestion below or type your own.
OAuth into Procore, ACC, PlanGrid, or Fieldwire. Drop in any Drive or SharePoint folder of drawings, specs, and submittals.
Drawings, specs, RFIs, submittals, change orders, safety logs, inspection reports, and punch lists — all unified per project.
Supers, PMs, and owners ask in plain English. Every reply cites the exact drawing sheet, spec section, or RFI it came from.
Have a question we didn't cover? Talk to our team